Thursday, July 28, 2016

Bare Copper Conductor in Concrete

Bare Copper Conductor in Concrete

Some professionals are reluctant to use bare copper conductor embedded in concrete. They argue that the basic nature of concrete would be a source of corrosion. However this is not a proven argument and different codes and standards have allowed the use of bare copper embedded in concrete as a ground electrode.
The following excerpts of codes can clarify this issue\;

NEC
National electrical code  Article 093, Section E.5 only rules out Aluminum conductor for direct burial in concrete for grounding purposes:

“5. Metals used for grounding, in direct contact with earth, concrete, or masonry, shall have been proven suitable for such exposure.
NOTE 1: Under present technology, aluminum has not generally been proven suitable for such use.
NOTE 2: Metals of different galvanic potentials that are electrically interconnected may require protection against galvanic corrosion.”

NEC article 094, section B.6 specifically refers to copper conductor for use as concrete encased electrode application:

“A metallic wire, rod, or structural shape, meeting Rule 93E5 and encased in concrete, that is not insulated from direct contact with earth, shall constitute an acceptable ground electrode. The concrete depth below grade shall be not less than 300 mm (1 ft), and a depth of 750 mm (2.5 ft) is recommended. Wire shall be no smaller than AWG No. 4 if copper, or 9 mm (3/8 in) diameter or AWG No. 1/0 if steel. It shall be not less than 6.1 m (20 ft) long, and shall remain entirely within the concrete except for the external connection. The conductor should be run as straight as practical.”


CSA
Canadian electrical code Section 10 item 10-700 accepts concrete encased copper conductor as a grounding electrode.

“10-700  Grounding electrodes (see Appendix B)
(3) A field-assembled grounding electrode shall consist of
(a) a bare copper conductor not less than 6 m in length, sized in accordance with Table 43 and encased within the bottom 50 mm of a concrete foundation footing in direct contact with the earth at not less than 600 mm below finished grade”

Also in item 10-806:

“(6) Notwithstanding Subrule (2), a grounding conductor No. 6 AWG or larger shall be permitted to be embedded in concrete provided that the points of emergence are located or guarded so as not to constitute exposure to mechanical damage.”

And in table 43, the size of bare copper conductor is specified for different ampacities of the service conductor:

Table 43
Minimum conductor size for concrete-encased electrodes
(See Rule 10-700.)

Ampacity of largest service conductor or equivalent for multiple conductors, A

Size of bare copper conductor, AWG

165 or less   
4
166–200   
3
201–260   
2
261–355   
0
356–475   
00
Over 475 
000





Saturday, August 29, 2015

Metring Plan


Ontario Transmission Code requires a Metering Service Provider (MSP) to be hired by load or generator customers for metering services. MSPs are third parties certified for the design, installation, commissioning and operation of metering equipment in HV stations.

AS a first step, MSP prepares a metering single line diagram (SLD) and sends to IESO for approval. MSP also prepares a metering plan to be submitted to IESO for approval. However, MSP does not submit the metering plan directly to the IESO as it needs to come from the Metered Market Participant (MMP). The plan needs to be updated with all the information including the MECs.

Once the SLD is approved IESO will then request package 2 to be submitted which will include the EITRP (Emergency IT Restoration Plan) and the MEC documents.  The secondary cable distances between IT's and the metering cabinet is required in order to complete the MEC calculations.

Friday, July 24, 2015

Partial Discharge Test



In terms of interpretation of partial discharge measurements, the results shall be considered acceptable and no further partial discharge tests required under the following conditions:

a) The magnitude of the partial discharge level does not exceed 500 pC during the 1 h test period.
b) The increase in partial discharge levels during the 1 h period does not exceed 150 pC.
c) The partial discharge levels during the 1 h period do not exhibit any steadily rising trend, and no sudden sustained increase in the levels occurs during the last 20 min of the test.

----------------
Reference:

IEEE C57.12.90: Test Code for Liquid-Immersed Distribution, Power, and Regulating

Thursday, July 23, 2015

The Network Management System (NMS)

The Network Management System (NMS)

The Network Management System (NMS) is the supervisory control and data acquisition tool. It performs the following functions:

1- SCADA, 

2- The Real Time Network Analysis

3- The Study Network Analysis.

4- Training Simulation.


It provides the real time voltage and loading on the transmission system as well as monitoring and control of the status of the switches and breakers connecting the equipment to form the integrated network for the purpose of safe and reliable operation of the transmission system.

The NMS also provides predicative assessment tools which help in providing awareness of the situation of different elements of the electrical transmission grid to the operator. 

-------------------
Reference: Hydro One Operations Capital

Saturday, June 21, 2014

Electrical Fun with Maya Angelou






Maya Angelou (1) said: 
"Talent is like electricity. WE don’t understand electricity. We use it.”

I say: 
“Talent is like electricity. Electrical engineers understand electricity. Therefore electrical engineers understand how talented they are!”

Masoud

June 21 2014

-------------------------------------------------
(1) Excerpts from Dr. Maya Angelou's website on her biography:

Dr. Maya Angelou is one of the most renowned and influential voices of our time. Hailed as a global renaissance woman, Dr. Angelou is a celebrated poet, memoirist, novelist, educator, dramatist, producer, actress, historian, filmmaker, and civil rights activist.

Born on April 4th, 1928, in St. Louis, Missouri, Dr. Angelou was raised in St. Louis and Stamps, Arkansas.

Dr. Angelou has served on two presidential committees, was awarded the Presidential Medal of Arts in 2000, the Lincoln Medal in 2008, and has received 3 Grammy Awards. President Clinton requested that she compose a poem to read at his inauguration in 1993. Dr. Angelou's reading of her poem "On the Pulse of the Morning" was broadcast live around the world.

Dr. Angelou has received over 50 honorary degrees and is Reynolds Professor of American Studies at Wake Forest University.








Saturday, February 15, 2014

Oil Containment Dimensions and safe distance between Power Transformers



Oil Containment Dimensions 

and 

safe distance between Power Transformers 




The effective volume of the oil containment shall be greater than or equal to the 110 per cent of the transformer oil. In case the oil containment is filled with gravel, the above percentage shall apply to the available volume of the containment (air pockets) for oil in case of an oil spillage. 

The volume of oil of a specific size transformer, might be different for different manufacturers. The BIL level can also affect the size of the tank and consequently the volume of transformer oil.

For a typical 20 MVA transformer with an Off-load tap changer,  the volume of oil  can be 5000 US Gallons or almost 19000 liters. 

Another important parameter in the design of the containment is the clearance between the transformer and containment wall. According to IEEE recommendation, the minimum horizontal distance of any oil contained part of the transformer and the containment wall would be 1.5 meters. 

Factory Mutual -the prominent insurer of industrial premises- is a good source for safty regulation and clearances and measure to mitigate the risk of hazards in heavy industrial projects including emergency generators, transformers and other station equipment.

Recommendations on the clearances of typical 20 MVA transformer would be as follows:

Between the transformer containment and a combustible wall: 25 feet (7.62 meters)

Between the transformer containment and a 2 hours fire-resistant wall: 15 feet (4.57 meters)

Between two transformers: 25 feet (7.62 meters) 
.
Note 1:  A brick wall is considered to be combustible and do not offer a 2 hours fire resistance.

Note 2: A fire wall would be required to install transformers closer to each other. Minimum distance between the transformer and the fire wall would be 1.5 meters.



Masoud Kashani

February 2014 

IESO Requirements


  
In Ontario, the protection and control as well as the communication block diagram of any new high voltage substation shall be sent to IESO (Independent Electricity System Operator) for approval. The same applies to the plans for the protection systems upgrades at existing stations.

In case the existing remote trip relays are out of date (say Statrel RT8B ), they shall be replaced with ABB NSD 570 relays and Bell S4T4 (Schedule 4 Type 4) phone circuits. Dual A and B protections for each line shall be provided to communicate with the relays at upstream Hydro One station.

The existing line impedance relay - if out of date - shall be replaced with SEL-421 relays. Reverse power protection may also be required to prevent embedded generation of feeding the grid or back feed of one line by the other in the case of distributed generation stations.

The expected in-service date for the new equipment shall be communicated to the IESO as well.

The IESO shall review the design and onfirm that the proposed upgrades will not result in a material adverse impact on the reliability of the integrated power system.

In any case, the requirements of Transmission System Code issued by Ontario Energy Board shall be satisfied.

February 14th. 2014